PV panels datasheet insight with selection criteria and MC4/PXI wiring/ connection for large PV farms - DC cable sizing, layout and termination +combiner box design, layout and assembly - MW scale central PV inverters: specifications and parameters programming - DC and AC side protection arrangements - Fixed PV panels mounting system: types, configuration and assembly - Mechanical PV tracking system including single and dual axis types - Large scale PV farms maintenance and inspection procedures - IEC and NEC standards for large scale grid connected PV farms - Recent market available wind turbines for large scale farms selection criteria - Foundation, erection and turbine assembly process - Generator converter system configuration and protection - Cable management, routing and termination - IEC and NEC standards for large scale grid connected wind farms - Case studies, PV farms, Benban and wind farms, Zaafarana, Egypt.
Bachelor Degree in Electrical and Control Engineering (144)
Data will be available soon!
| content serial | Description |
|---|
Start your application