Improvement of productivity through designing and developing various work centers. The detailed restudying of work centers to find better ways to produce the products and/or improve their quality. Study of basic techniques required to establish an allowed time standard to perform a given task. Performance rating and measurement of work content of prescribed methods with considerations for allowance for fatigue and personal unavoidable delays.
B.Sc. in Industrial and Management Engineering
Data will be available soon!
content serial | Description |
---|---|
1 | Introduction
The Development of Motion and Time Study
Product flow macromotion study
Micromotion study
Micromotion study
Workstation design
7th Week Exam
Predetermined time standards
Predetermined time standards
Stopwatch time study
Stopwatch time study
12th Week Exam
Work balancing
Wage payment systems
Revision |
2 | |
3 | |
4 | |
5 | |
6 | |
7 | |
8 | |
9 | |
10 | |
11 | |
12 | |
13 | |
14 | |
15 | |
16 | |
Start your application