Construction of multistory buildings - Shoring and reshoring operations - Assessment of formwork removal times - Advanced formwork systems - Slip form technique - Lift slab system - Tilt-up construction - Up-down construction technique - Precast concrete technology - Bridge construction systems -Cast-in-place system - cantilever carriage method - flying shuttering - Tunnel construction - Compressed air - Blasting rock.
B.Sc. in Construction and Building Engineering 180 Cr.Hr.
Data will be available soon!
| content serial | Description |
|---|
| 1 | Week No.1: Shoring and reshoring operations. |
| 2 | Week No.2: Shoring and reshoring operations (cont.). |
| 3 | Week No.3: Design and construction of advanced horizontal formwork systems . |
| 4 | Week No.4: Design and construction of advanced vertical formwork systems. |
| 5 | Week No.5: Design and construction of advanced special formwork systems. |
| 6 | Week No.6: Advanced systems in building construction. |
| 7 | Week No.7: Advanced systems in building construction ( cont.). |
| 8 | Week No.8: Precast concrete technology. |
| 9 | Week No.9: Bridge construction systems. |
| 10 | Week No.10: Bridge construction systems (cont.). |
| 11 | Week No.11: Bridge construction systems (cont.) |
| 12 | Week No.12: Tunnel construction. |
| 13 | Week No.13: Tunnel construction (cont.). |
| 14 | Week No.14: Blasting rock. |
| 15 | Week No.15: Health and Safety. |
| 16 | Week No.16: Final Exam. |
| 1 | Week No.1: Shoring and reshoring operations. |
| 2 | Week No.2: Shoring and reshoring operations (cont.). |
| 3 | Week No.3: Design and construction of advanced horizontal formwork systems . |
| 4 | Week No.4: Design and construction of advanced vertical formwork systems. |
| 5 | Week No.5: Design and construction of advanced special formwork systems. |
| 6 | Week No.6: Advanced systems in building construction. |
| 7 | Week No.7: Advanced systems in building construction ( cont.). |
| 8 | Week No.8: Precast concrete technology. |
| 9 | Week No.9: Bridge construction systems. |
| 10 | Week No.10: Bridge construction systems (cont.). |
| 11 | Week No.11: Bridge construction systems (cont.) |
| 12 | Week No.12: Tunnel construction. |
| 13 | Week No.13: Tunnel construction (cont.). |
| 14 | Week No.14: Blasting rock. |
| 15 | Week No.15: Health and Safety. |
| 16 | Week No.16: Final Exam. |