- Degree Master
- Code: Cb715
- Credit hrs: 3
- Prequisites:
Design of form work for concrete structures: horizontal formwork and vertical formwork Causes of failure Analysis of loads, deflections and stresses of formwork systems. Assessment of removal times. Shoring and unshoring systems. Health and safety in concrete construction. Concreting under water Concrete in marine environment. Special concretes: Hot weather concrete, Mass concrete, ready mix concrete, self compacting concrete, high performance concrete.
Management
Data will be available soon!
content serial | Description |
---|
Start your application