- Degree Master
- Code: CB 737
- Credit hrs: 3
- Prequisites:
Site investigation for piling Basic piling methods Design of single piles Design of pile groups Design of piles subjected to lateral loads Special considerations for design and construction of offshore piles Tension leg platforms Load distribution among group piles Retaining walls Problems in pile construction Integrity testing Pile testing Pile dynamics Choice of pile construction method and economics of design.
M.Sc. in Structural Engineering
Data will be available soon!
content serial | Description |
---|
Start your application