- Code: 1GQ373
- Level Beginner
- Category Healthcare Management
- Total hrs 10
- Course Language English
- Email pqi-training@aast.edu
- Phone 01207355555
1- Learning The key components expected for effective facility/utility/equipment qualification2- Learning Writing and documenting a user requirements specification (URS), design qualification (DQ), installation qualification (IQ), operational qualification (OQ) and performance qualification (PQ)3- Distinguish between equipment qualification and validation • Identify regulatory standards and guidelines as they apply to equipment validation• Describe the purpose of each stage from equipment qualification to process validation 4- • Describe a procedural, systematic approach to support successful equipment lifecycle• Understand how to identify nominal ranges and operating limits for manufacturing equipment
• The Concept of Equipment qualification• Current Regulatory Expectations• Facility Design and Qualification of Equipment and Utilities• Benefits of Equipment Qualification• Equipment Qualification Process• Qualification Planning• Master Validation Plans• Qualification Need Assessment• Risk Classification• Direct Impact and Indirect Impact and No Impact• Impact Based Qualification Activities FAT (Factory Acceptance Testing)• SAT (Site Acceptance Testing)• Equipment Design Qualification (DQ)• DQ Review Documents• Installation Qualification (IQ)• Documents to Analyze During IQ Review• Pre-conditions for IQ Execution• Equipment Operational Qualification (OQ)• OQ and Commissioning• Pre-Conditions for OQ Execution:• Equipment Performance Qualification (PQ)• Pre-conditions for PQ execution:• Requalification• Change Control •