Make an integration and collaboration within AASTMT branches and managements to spread the activity and to avoid conflict and duplication of efforts and works.
Enhance the energy lab by practical training kits such as PV simulator to be used in industrial testing and calibration.
Install an industrial prototype for energy efficient and renewable energy such as:
5kw PV system to supply a partial load of a building and to be used in practical tanning.
Install a solar heater unit of 300liter capacity.
Determine an annual budget for energy projects that will be discussed every year in order to measure the impact and priorities.
Complete the structure and formal link between the unit and other AASTMT structure to enhance the benefit not only in Alexandria but also in other branches.
- Increase the relationship between energy unit and industrial sector.